Altera Nios II Manuale Utente Pagina 13

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 22
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 12
Altera Corporation 1–5
May 2007 Nios II Development Kit Getting Started User Guide
Getting Started
Figure 1–1. Nios Development Board with Power, LCD,& USB-Blaster Connections
To set up the Nios development board, perform the following steps:
1. Remove the Nios development board from its anti-static shipping
bag. Take care not to expose the board to electrostatic discharge
(ESD) during setup or use.
2. Place the board legs-down on a flat surface. Orient the board as
shown in Figure 1-1 with the dual 7-segment LEDs (U8 and U9)
closest to you.
3. Connect the LCD module ribbon cable to connector J12, as shown in
Figure 1–1.
1 Be sure to connect pin 1 on the LCD module to pin 1 of J12
by aligning the triangular marks on the ribbon cable header
with the locations of pin 1 on the LCD module and the J12
header. Pin 1 of the J12 header is labeled on the printed
circuit board.
Vedere la pagina 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 21 22

Commenti su questo manuale

Nessun commento